Regulatory PathRegulatory requirements compared

SFDA item 12 · II. Quality changes · II.1 Active substance a) Manufacture

Change to in-process tests or limits applied during the manufacture of the active substance

Variation category under SFDA, EU and US FDA rules for this change, with the variant wording as published.

Open in the Variation Compass

SFDA Saudi Food and Drug Authority

Guidelines for Variation Requirements v6.3 (DS-G-006), item 12 — official PDF, p. 20 ↗

VariantChangeType
aTightening of in-process limitsType IA
bAddition of a new in-process test and limitsType IA
cWidening of the approved in-process control (IPC) limits, which may have a significant effect on the overall quality of the active substanceType II
dDeletion of an in-process test which may have a significant effect on the overall quality of the active substanceType II
eAddition or replacement of an in-process test as a result of a safety or quality issueType IB
fDeletion of a non-significant in-process testType IA

Conditions to be fulfilled and documentation to be supplied: see the official guideline, item 12.

EU European Union

Commission Guidelines C/2025/5045 — EUR-Lex ↗

Q.I.a.4 · Change to in-process controls applied during the manufacture of the active substance, intermediate of an active substance or starting materials for biological active substance

VariantChangeType
aMinor change of in-process control limitsType IA
bAddition of new in-process control and limits with its corresponding analytical procedureType IA
cDeletion of a non-significant or obsolete in-process controlType IA
dWidening of the approved in-process control limits, which may have a significant effect on the overall quality of the active substanceType II
eDeletion of an in-process test which may have a significant effect on the overall quality of the active substanceType II
fChange of an analytical procedure for an in-process controlType IA
gReplacement of an in-process control with its corresponding analytical procedureType IB

US FDA US Food and Drug Administration

21 CFR 314.70 and FDA guidance — 2004 Guidance §VIII.B–D · 2014 AR Guidance App. A 4.5, 4.9 · 21 CFR 314.70(b)(2)(i)

ChangeCategoryReference
Tightening an in-process acceptance criterionAnnual report2014 App. A 4.9; 2004 §VIII.D.3
Adding a new in-process testAnnual report2014 App. A 4.5
Replacing the in-process procedure for material after the final intermediate with one of equal or greater assuranceCBE-0 supplement2004 §VIII.C.2.b
Relaxing or deleting an in-process test or limit for material before the final intermediateCBE-30 supplement2004 §VIII.C.1.b
Relaxing or deleting an in-process test or limit at or after the final intermediatePrior approval supplement2004 §VIII.B.1–2; 21 CFR 314.70(b)(2)(i)

Note: FDA has no annual-report route for deleting an in-process test, however minor: deletion is CBE-30 before the final intermediate (§VIII.C.1.b) and PAS at or after it (§VIII.B.2). Replacing a procedure for material before the final intermediate with one of equal or greater assurance is AR (§VIII.D.4).

Other items in II.1 Active substance a) Manufacture

Not regulatory advice. The binding text is each regulator's current official document; confirm the category with the authority before filing. FDA publishes no classification table: the US category follows FDA guidance or, where the guidance does not name the change, the closest example under 21 CFR 314.70.